How long does sampling and bulk production take?
One question, answered directly, with the catalog figures behind it.
How long does sampling and bulk production take?
Timeline is mostly determined by whether you start from stock or from scratch. In-stock models skip tooling; a bespoke programme adds feasibility, tooling and sample revision before bulk production can begin.
What does the catalog data show?
| Stage | Typical duration |
|---|---|
| Colour and lens samples | 5-7 working days |
| OEM sketch to approved sample | About 45 days |
| Bulk production | 30-45 days after sample approval |
The values above are the supplier terms published on this site. Confirm the applicable specification in a written quotation.
What should you take away?
Key takeaways
- Colour and lens samples: 5-7 working days.
- OEM sketch to approved sample: about 45 days.
- Bulk production: 30-45 days.
What do buyers also ask?
Can I skip sampling with in-stock models?
In-stock models avoid the OEM tooling and sample-development phase; confirm sample requirements in the quote.
What is the 45-day figure?
The period from sketch to approved sample in an OEM development programme.
Where can I check the underlying data?
Every model referenced above is listed individually in the static product directory with its SKU, frame colour, shape and per-pair price. The benchmark report states how the counts were produced.